Two-storeyed Office Building in Répcelak
June 2019
For an office building under construction in Répcelak (Vas county) 90 m3 of Energocell® foam glass granules were purchased to be built in between the foundation strips. The granules were laid and compacted in two layers, and by this method a 30-cm final layer thickness was obtained. Given that the thermal insulation was built under the reinforced concrete, no insulation boards were incorporated in the internal layer structure.